Enterprise Website Redesign Timeline: A 24-Week Roadmap
A practical 24-week roadmap for enterprise website redesign, from discovery and narrative framing to WebGL staging, CMS migration, QA, and a controlled launch.
What makes an enterprise redesign different?
The 24-week timeline at a glance
Weeks 1 to 3: Discovery and alignment
Weeks 4 to 6: Narrative and information architecture
Weeks 7 to 10: UX and interactive prototyping
Weeks 11 to 14: Visual system and WebGL asset staging
Weeks 15 to 19: CMS build and migration preparation
Weeks 20 to 22: QA and launch rehearsal
Weeks 23 to 24: Zero-downtime launch and stabilization
How should you keep the timeline on track?
Sources and references
Frequently asked questions
How long does an enterprise website redesign take?
An enterprise website redesign often needs six months or more when it includes discovery, narrative work, interactive prototyping, CMS implementation, migration, integrations, QA, and launch planning. The 24-week model here is a practical starting point for one connected program, not a fixed industry rule.
What are the main website redesign milestones?
The main milestones are an approved brief, approved information architecture, tested prototype, approved design system, release candidate, signed QA and launch checklist, and stabilized production site. Each milestone gives the next team a decision it can use rather than another round of general feedback.
When should content migration start?
Content migration should start during discovery and become active during CMS build. Audit and classification happen early, field mapping follows the content model, and a representative migration batch runs before the full move. Waiting until the final weeks turns missing owners and broken relationships into launch risk.
How do you protect SEO during a redesign?
Protect SEO by preserving valuable URLs where possible and mapping every changed URL to a relevant destination. Test permanent redirects, canonicals, metadata, internal links, structured data, XML sitemaps, and crawl controls in staging and after launch. Google Search Central recommends permanent server-side redirects for pages that have moved permanently.
Where does WebGL fit in an enterprise website timeline?
WebGL belongs in the concept and technical planning phases, then moves through asset staging, implementation, device testing, and performance review. Define the job the 3D experience must do, provide a lighter path for constrained devices, and test reduced-motion behavior before launch. It should support the message, not compete with it.
What makes a launch zero downtime?
A zero-downtime launch uses a rehearsed deployment, backups, monitoring, tested redirects, a rollback path, and named owners for release, support, and triage. Teams verify the highest-value journeys immediately after the switch and keep the previous environment available until the new site proves stable.